卢阿西姆水电站修复与扩容工程施工导截流设计 被引量:3

Diversion and Closure Design in the Restoration and Expansion Project of Luachimo Hydropower Station
下载PDF
导出
摘要 分析了该工程的施工特点及与国内河流不同的水文特征,并据此制定了合理的施工导截流规划及设计方案,方案的关键点在于导截流程序、围堰拆除程序,程序环环相扣。该围堰的设计、施工、运行接受了卢阿西姆河多年洪水的考验,为主体工程建设的顺利推进发挥了重要作用,对海外类似工程也有借鉴价值。 This paper analyzed the construction characteristics of the project,different from the hydrological characteristics of domestic rivers,and based on this,a reasonable construction diversion and closure planning and design scheme was proposed.The key point of the scheme based on the program of diversion and closure,the program of cofferdam removal,the program was interlinked.The design,construction and operation of the cofferdam had been tested by the flood of the Luachimo River for many years,which had played an important role in the smooth progress of the main project construction,and also had a reference value for similar overseas projects.
作者 张进 张淳 ZHANG Jin;ZHANG Chun(Guangdong Hydropower & Planning & Design Institute Co., Ltd, Guangzhou 510635, China;School of Educational Information Technology, South China Normal University, Guangzhou 510631, China)
出处 《广东水利水电》 2021年第7期97-103,共7页 Guangdong Water Resources and Hydropower
关键词 安哥拉 卢阿西姆 水电站 维修加固 导截流 Angola Luachimo hydropower station maintenance and reinforcement division
  • 相关文献

参考文献1

  • 1吕兴祖,刘发权..施工截流与基坑排水[M].北京:水利电力出版社,1987:183.

同被引文献27

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部