摘要
为了最大限度减少地铁盾构作业导致的地表沉降情况发生,文中依托国内某地铁线路区间工程开展了相关讨论和分析,建立了相关分析模型。从地表沉降位移云图、监测点处的地表沉降等两个方面进行了分析,并得出了相关结论。
In order to minimize the ground settlement caused by Metro Shield operation, this paper carries out relevant discussion and analysis based on a domestic metro line section project, and establishes the relevant analysis model. This paper analyzes the surface subsidence from two aspects: the cloud map of surface subsidence displacement and the surface subsidence at the monitoring point, and draws relevant conclusions.
作者
甄精莲
Zhen Jinglian(Hunan Technical College of railway high-speed,Hengyang,Hunan 421001)
出处
《江西建材》
2021年第5期110-111,共2页
Jiangxi Building Materials
基金
衡阳市级课题2019jh011081。
关键词
地铁施工
盾构施工
地表沉降
规律分析
Subway construction
Shield construction
Ground settlement
Regular analysis