摘要 随着风力发电机组功率等级增加,变桨轴承的尺寸逐渐增大,安装操作和质量控制的难度相应增加;尤其面临海上恶劣复杂运行环境,变桨轴承的质量问题将给维护带来极大困难和挑战。目前国内主要采用人工对变桨轴承螺栓进行安装和紧固,人工紧固存在诸多不可控因素,难以实现精准控制。本文提出了一种利用机器人系统自动化紧固变桨轴承螺栓的方案,实现精准控制和提升机组质量的目的。 The size of pitch bearing is gradually increasing with the increase of wind turbine power level,meanwhile,the installation operation and quality control for pitch bearing is correspondingly increasing;the maintenance will be more and more difficult and challenging for the pitch bearing which is installed on the offshore wind turbine,because the offshore wind turbine will operate at very harsh and complex environments.At present,The installation and fastening for the pitch bearing bolts mainly depend on manual operation in domestic,but there are many uncontrollable factors in manual tightening,which makes it difficult to achieve precise control.In this paper,a scheme of tightening pitch bearing bolts automatically using robot system is proposed to achieve the purpose of precise control and improve the installation quality of the pitch bearing.
作者 袁钰杰 荣必贤 刘贵林 成伟 YUAN Yujie;RONG Bixian;LIU Guiling;CHENG Wei(Dongfang Electric Wind Power Co.,Ltd.,618000,Deyang,Sichuan,China;DEC Academy of Science and Technology Co.,Ltd.,611731,Chengdu,China)
出处 《东方电气评论》 2021年第2期50-53,共4页 Dongfang Electric Review
关键词 变桨轴承 螺栓紧固 机器人 自动化系统 质量控制 pitch bearing bolt tightening robot automated system quality control
  • 相关文献

参考文献4

二级参考文献54

  • 1谭福生,葛景国.力控制技术在机器人打磨中的应用及系统实现[J].上海电气技术,2008,1(2):35-40. 被引量:24
  • 2周富强,张广军.标定十字结构光传感器的新方法[J].光电工程,2006,33(11):52-56. 被引量:3
  • 3JB/T10705-2007,滚动轴承风力发电机轴承[s]. 被引量:2
  • 4Rothe Erde Slewing Bearings. Products:Slewing Bear- ings Technical Bases [ EB ]. www. RotheErde. com. 被引量:1
  • 5IMO Installation and Maintenance Instructions for Sle- wing Rings[ EB]. www. imo. de. 被引量:1
  • 6Diamond K E. Extreme weather impacts on offshore wind turbines: lessons learned[J]. Natural Resources & Environment, 2012, 27(2): 1-5. 被引量:1
  • 7Sage A P. Systems engineering[M]. New York: J. Wiley, 1992. 被引量:1
  • 8Sarker B R, Faiz T I. Minimizing maintenance cost for offshore wind turbines following multi-level opportunistic preventive strategy[J]. Renewable Energy, 2016, 85: 104-113. 被引量:1
  • 9Rademakers L W M M, Braam H. O & M Aspects of the 500 MW Offshore wind farm AT NL7[R]. DOWEC report, Pet-ten: ECN, 2002. 被引量:1
  • 10Rademakers L W M M, Braam H, Zaaijer M B, et al. Assessment and optimisation of operation and maintenance of offshore wind turbines[R]. ECN Wind Energy, Tech. Rep. ECN-RX-03-044, Petten ~ ECN, 2003. 被引量:1