摘要
新冠疫情期间应急工程具有“三边工程”的特点,施工组织受疫情影响程度深。劳动力、物资材料、疫情防控等方面,不同程度地加大了施工组织的难度,需要进一步把准施工组织的要点,从而实现工程的有序施工。
Emergency project under COVID-19 epidemic has three-party characteristics.Construction organization suffered from obvious influence from the epidemic.Labor,construction material and pandemic control also produced construction difficulties.Key points for construction organization shall be further managed and controlled to realize smooth construction.
作者
尹硕
陈连义
焦建军
李科
王子仪
YIN Shuo;CHEN Lian-yi;JIAO Jian-jun;LI Ke;WANG Zi-yi(Beijing Sixth Construction Group Co.,Ltd.,100143,Beijing,China)
出处
《建筑技术》
2021年第6期767-768,共2页
Architecture Technology
关键词
战备病房工程
集装箱式预制模块
施工组织
combat readiness ward project
container-type prefabricated module
construction organization