地下工程分期建设防水预留后接技术(二)——施工缝或后浇带 被引量:5

Subsequent Waterproofing Connection Technology(Part 2)for Reserved Joints of Staged Underground Construction——Construction Joint or Post Casting Strip
下载PDF
导出
摘要 介绍了地下工程分期建设时,一期预留运行、二期短时后接时采用施工缝连接的顶板与外墙防水构造设计,以及二期长时后接时采用后浇带对接的底板防水构造设计。 For staged underground construction project,this paper introduces the waterproofing structure design of the subsequent second phase connection of the roof and exterior walls with construction joint shortly after the operation of the first phase,and the connection of floor plate with post casting strip long after the first phase operation.
作者 张道真 易举 曾小娜 黄瑞言 Zhang Daozhen;Yi Ju;Zeng Xiaona;Huang Ruiyan(School of Architecture&Urban Planning,Shenzhen University,Shenzhen,Guangdong518060,China;Expert Committee of Shenzhen Waterproof Association,Shenzhen,Guangdong518031,China;Institute of ArchitecturalDesign and Research,Shenzhen University,Shenzhen,Guangdong518060,China;Shenzhen TsinghuayuanArchitecture and Planning Design Research Co.,Ltd.,Shenzhen,Guangdong518051,China)
出处 《中国建筑防水》 2021年第5期31-34,共4页 China Building Waterproofing
关键词 地下工程 分期建设 防水层预留 施工缝 后浇带 防水构造 underground construction staged construction waterproofing layer reservation construction joint post casting strip waterproofing structure