目前新建高速铁路引入既有枢纽的情况越来越普遍,当枢纽联络线较短时,高速铁路枢纽RBC切换方案比较复杂。本文就高速铁路枢纽短联络线RBC切换方案进行研究,为相关设计工作提供有益借鉴。
At present, it is common to connect a newly-built high-speed railway to existing hubs.When the connection line to a hub is too short, the RBC handover scheme of high-speed railway hub will be relatively complex. The RBC handover scheme of the short connection line of high-speed railway hub is studied, providing useful reference for related design work.
出处
《铁道通信信号》
2021年第3期9-11,共3页
Railway Signalling & Communication
关键词
高速铁路枢纽
短联络线
RBC切换
High-speed railway hub
Short connection line
RBC handover