期刊文献+

2×300MW火电机组全工况脱硝改造工程

2×300MW Thermal Power Unit denitration transformation project under all working conditions
下载PDF
导出
摘要 本文针对新疆某火电厂2×300MW机组在低负荷工况运行时出现氮氧化物排放超标的情况,对该项目进行了全工况脱硝工艺改造,通过增设旁路烟道、挡板门改造和将全工况脱硝系统接入DCS系统改造后,使该火电厂机组氮氧化物的排放达到环境保护要求,为同类火电厂机组全工况脱硝改造工程提供应用参考。 Based on a certain power plant 2 × 300 mw unit in Xinjiang excess nitrogen oxide emissions during low load operation,the project for the full process denitration technology transformation,by adding a bypass duct,damper and the full process denitration system connected to the DCS system after modification,such as to make the power plant unit nitrogen oxide emissions meet environmental protection requirements,for the similar thermal power plants unit full process denitration project application reference.
作者 王晓龙 WANG Xiao-long
出处 《节能与环保》 2021年第4期65-66,共2页
关键词 火电厂 全工况脱硝 脱硝系统改造 thermal power plant Full working condition denitrification Transformation of denitration system
  • 相关文献

参考文献1

二级参考文献6

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部