浅谈岩滩水电站2号机调速器电气部分升级改造 被引量:5

Discussion on Upgrading of Electrical Part of Governor of Unit 2 in Yantan Hydropower Station
下载PDF
导出
摘要 针对岩滩水电站2号机调速器设备老化且不满足国家能源局有关的“二十五项反措”中“失电动作”的要求,进行了原因分析及升级改造,文章对改造后符合“失电动作”规则,新增加的蠕动报警功能、对时及自动水头采集功能,实现导叶开度测量三选二、功率测量二选二逻辑,支持IEC 61850 MMS网络通信以及对改造后待优化问题及解决措施等进行了详细介绍。经实践证明,改造取得了良好的效果,为机组的安全运行打下了坚实的基础,也为水电站调速器电气部分升级改造提供了宝贵的借鉴经验。 In view of the aging of governor equipment of No.2 unit of Yantan Hydropower Station and the failure to meet the requirements of "power loss action" in "twenty five counter measures",the cause analysis and upgrading are carried out,and the rule of "power loss action" is complied with after the transformation.In this paper,the newly added creeping alarm function,time synchronization and automatic water head acquisition function,the realization of two out of three logic for guide vane opening measurement and two out of two logic for power measurement,the support of IEC 61850 MMS network communication,and the problems to be optimized and solutions after transformation are introduced in detail.The practice shows that the transformation has achieved good results,laid a solid foundation for the safe operation of the unit,and also provided valuable experience for the upgrading of the electrical part of the governor of hydropower station.
作者 林广 LIN Guang(Datang Yantan Hydropower Co.,Ltd.,Dahua,Guangxi,530811)
出处 《红水河》 2021年第2期141-145,149,共6页 Hongshui River
关键词 调速器 电气改造 岩滩水电站 governor electrical transformation Yantan Hydropower Station
  • 相关文献

参考文献4

二级参考文献5

共引文献24

同被引文献28

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部