期刊文献+

BIM技术在城市高架桥施工中的应用 被引量:8

Application of BIM Technology in Construction of Viaduct
下载PDF
导出
摘要 以长沙湘府路项目为工程背景,为解决城市桥梁施工中交通疏解、交叉施工、场地受限、工期紧等难题,利用BIM技术建立高架桥三维可视化模型,对施工过程中的交通疏解方案、施工方案模拟、进度管理、安全质量管理等应用点进行积极探索和落实,深入研究BIM技术在桥梁工程中的应用价值,并取得良好的应用效果。 Based on the Xiangfu road project in Changsha,in order to solve the problems in urban bridge construction,such as traffic relief,cross construction,limited site and short construction period,a threedimensional visual model of viaduct is established by BIM,which actively explores and implements the traffic relief scheme,construction scheme simulation,progress management,safety and quality management and other application points.The application value of BIM is deeply studied,application effect is achieved.
作者 李磊 李江 LI Lei;LI Jiang(The 5th Engineering Co.,Ltd.China Railway Major Bridge Engineering Group,Jiujiang,Jiangxi 332001,China)
出处 《施工技术》 CAS 2021年第6期77-79,共3页 Construction Technology
基金 中国中铁股份有限公司科技研究开发计划(2018-重大-04)。
关键词 高架桥 建筑信息模型 交通 模拟分析 管理 viaduct building information modeling(BIM) traffic simulation analysis management
  • 相关文献

参考文献8

二级参考文献39

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2金淮,刘永勤,钟巧荣.中国城市轨道交通安全风险管理现状与展望[J].工程勘察,2008,36(S2):216-220. 被引量:17
  • 3Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010. 被引量:1
  • 4Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x. 被引量:1
  • 5Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144. 被引量:1
  • 6Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012. 被引量:1
  • 7Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166. 被引量:1
  • 8Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180. 被引量:1
  • 9Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246. 被引量:1
  • 10杨煊,周水兴.斜拉桥施工阶段初张索力计算方法研究[J].重庆交通大学学报(自然科学版),2008,27(1):32-36. 被引量:21

共引文献670

同被引文献43

引证文献8

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部