摘要
以某高速公路特大桥项目为例,该桥为双塔单索面斜拉桥,论文重点从斜拉索及索塔施工2方面分析其施工工艺,并总结施工期间技术要点及注意事项,旨在为同类型项目提供参考。
Taking an super-large highway bridge project as an example,the bridge is a two-tower cable-stayed bridge with single cable plane,this paper mainly analyzes the construction technology from the two aspects of cable and tower construction,and summarizes the technical points and matters needing attention during the construction,in order to provide reference for the same type of projects.