3OKAMOTO P A, NAUSSBAUM P J, SMITH K D, et al. Guidelines for Timing Contraction Joint Sawing and Earliest Loading for Concrete Pavements. Volume 1 : Final Report, FHWA- RD - 91 -079 [R]. Washington, D. C.: Federal Highway Administration, 1994. 被引量:1
4VOIGT G V. Early Cracking of Concrete Pavement: Causes and Repairs [ DB / OL]. American Concrete Pavement Association. (2002-05-02). Web access May 2008. http: //www. airtech, tc. faa. gov/naptf/att07/ 2002% 20TRACK% 20P. pdf/P-68, pdf. 被引量:1
6KIM J, BUTTLAR W G. Analysis of Reflective Crack Control System Involving Reinforcing Grid over BaseIsolating Interlayer Mixture [ J]. Journal of Transportation Engineering, 2002, 128 ( 4): 375-384. 被引量:1
7BANHOLZER B, BRAMESHUBER W, JUNG W. Analytical Evaluation of Pull-out Tests: the Inverse Problem [ J ]. Cement and Concrete Composites, 2006, 28 (6) : 564 -571. 被引量:1
8KIM J, BUTYLAR W G. Analysis of Reflective Crack Control System Involving Reinforcing Grid over Baseisolating Interlayer Mixture [ J ]. Journal of Transportation Engineering, 2002, 128 (4) : 375 -384. 被引量:1
9TALESNICK M L, RINGEL M. Completing the Hollow Cylinder Methodology for Testing of Transversely Isotropic Rocks : Torsion Testing [ J ]. International Journal of Rock Mechanics and Mining Sciences, 1999, 36 (5) : 627 - 639. 被引量:1