期刊文献+

基于MicroStation和FME的矿测“一张图”数据同步技术

Technology of Data Synchronization of"One Map"Based on MicroStation and FME Mine Survey
下载PDF
导出
摘要 针对现有AutoCAD与ArcGIS平台矿图数据更新慢、数据保存不完整等问题,本文运用MicroStation与FME技术,以工程实例AutoCAD平台的DWG格式文件转换为ArcGIS平台下的shape格式文件,通过MicroStation相对格式无损转换的基础上,结合FME的二次开发技术,实现了矿图格式的准确转换继而解决了矿图数据更新慢的问题。实践表明,本技术能够对矿图更新、矿图格式转换以及GIS在矿测工程中的成熟使用提供一定的技术参考。 Aiming at the problems of slow updating and incomplete saving of mining map data on the existing AutoCAD and ArcGIS platforms,this paper uses MicroStation and FME technology to convert the DWG format file of engineering example AutoCAD platform to the shape format file under the platform.Based on the relative format lossless conversion and the FME secondary development technology,the accurate conversion of mine map format is realized and the problem of slow updating of mine map data is solved.According to the practice,this technology can provide some technical reference for mine map updating,format conversion and mature use of GIS in mine survey engineering.
作者 孙立城 Sun Licheng(School of Information and Electrical Engineering,Hebei University of Engineering,Hebei Handan 056038)
出处 《山东煤炭科技》 2021年第3期173-176,共4页 Shandong Coal Science and Technology
关键词 矿图 ARCGIS FME 数据同步 mine map ArcGIS FME data synchronization
  • 相关文献

参考文献5

二级参考文献32

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部