摘要
以天湖大桥吊索更换施工为工程背景,介绍了包括抗滑拉索在内的吊索更换与张拉方案,对施工方案的实施进行了分析与控制。
Based on the construction of hanger replacement of Tianhu bridge,this paper introduces the scheme of hanger replacement and tension including antislip cable,analyzes and controls the implementation of the construction scheme.
作者
王斌
WANG Bin(Modern Engineering Test Co.,Ltd.,Dalian University of Technology,Liaoning Dalian 116024 China)
关键词
自锚式悬索桥
吊索更换
吊索调整
施工控制
self-anchored suspension bridge
hanger replacement
hanger tension
construction control