期刊文献+

晋华宫矿8109综掘面注水防尘技术应用 被引量:2

Application Discussion on Water Injection and Dust Control Technology in 8109 Fully Mechanized Excavation Face of Jinhuagong Colliery
下载PDF
导出
摘要 针对矿井综掘工作面粉尘产出量大的问题,本文通过对煤层注水降尘机理的研究,并结合晋华宫矿8109综掘工作面的地质概况,设计了煤层注水方案,研究了不同掘进深度时各个测点的粉尘浓度,得到了煤层含水量随着钻孔深度的变化规律,确定了最佳的注水位置。监测结果表明:对煤层注水后,工作面的呼吸性粉尘和全尘的浓度得到有效控制。 Aiming at the problem of large dust output in fully mechanized excavation face of the mine,the author designed a coal seam injection scheme,studied the dust concentration at each measurement point at different driving depths,obtained the variation law of coal seam water content with borehole depth and determined the best water injection position by studying the mechanism of coal seam water injection and dust reduction,combined with the geological profile of Jinhuagong Mine 8109 fully-mechanized excavation face.Monitoring results show that:after injecting water into the coal seam,the concentration of respirable dust and total dust in the working face is effectively controlled.
作者 许瑾 Xu Jin(Jinhuagong Colliery,Datong Coal Industry Group Co.,Datong,Shanxi 037016)
出处 《江西煤炭科技》 2021年第1期154-156,共3页 Jiangxi Coal Science & Technology
关键词 综掘工作面 控制粉尘浓度 煤层注水 呼吸性粉尘 全尘 fully mechanized excavation face control dust concentration coal seam water injection respirable dust all dust
  • 相关文献

参考文献5

二级参考文献67

共引文献48

同被引文献20

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部