摘要
为保证泵房工程施工质量,专业的施工方案及技术水平是关键。通过对一般泵房施工方案的总结分析,将其施工分为基础结构、主体、砌筑粉刷三个阶段,并分别分析了各个阶段的施工技术重难点,提出模板工程、钢筋工程、混凝土工程中相应的施工工艺及质量控制要点,总结相关设计参数的控制指标,为类似工程提供参考。
In order to guarantee the engineering construction quality of pumping house,the professional construction scheme and technical level are the keys.By summarizing and analyzing the general construction schemes of pumping house,its construction is divided into three stages of infrastructure,main part and masonry painting.The important and difficult points of construction technology in each stage are analyzed separately.The relevant construction technologies and the quality control essentials in the formwork engineering,rebar engineering and concrete engineering are put forward.The control indexes of the relevant design parameters are summarized.The references are provided for the similar projects.
作者
裴习军
丁长围
PEI Xijun;DING Changwei(不详)
出处
《城市道桥与防洪》
2021年第1期151-153,186,M0015,共5页
Urban Roads Bridges & Flood Control
关键词
泵房工程
模板工程
钢筋工程
砌筑块
质量控制
pumping house engineering
formwork engineering
rebar engineering
masonry block
quality control