摘要
针对抽水蓄能电站容量优化规划过程中所需建立模型及其解算方法的复杂性和寻求经济性最优的单一性的问题,提出一种基于主成分分析的抽水蓄能电站容量优化规划方法。通过对抽水蓄能电站特性的分析,建立抽水蓄能电站的优化规划指标体系;根据系统调峰约束和库容约束确定抽水蓄能电站容量规划集,利用系统风电-抽水蓄能之间的协调配合关系求取不同规划容量的指标值;采用主成分分析法对各规划容量的指标值进行分析,确定最优抽水蓄能电站规划容量。实例分析结果证明了方法的正确性和可行性。
A multi-objective optimization planning method for pumped storage system based on principal component analysis is proposed to find the optimal capacity and economy of pumped storage system. Firstly,the optimal planning target system of the pumped storage system is established from the economical and technical point of view. Then,under different planning scenes,the restraint programs are calculated by using the coordination relationship between the wind power and pumped storage capacity. And then use the principal component analysis method to analyze the planning target value of each capacity to determine the optimal pumping capacity of the pumped storage system. The results of the instance analysis show the correctness and feasibility of the method.
作者
肖白
杨宇
姜卓
王茂春
周鹏
顾兵
Xiao Bai;Yang Yu;Jiang Zhuo;Wang Maochun;Zhou Peng;Gu Bing(School of Electrical Engineering,Northeast Electric Power University,Jilin 132012,China;State Grid Yingtan Electric Power Company,Yingtan 335000,China;School of Computer Science and Technology,Beihua University,Jilin 132012,China;State Grid Qinghai Electric Power Company,Xining 810008,China)
出处
《太阳能学报》
EI
CAS
CSCD
北大核心
2020年第12期270-277,共8页
Acta Energiae Solaris Sinica
基金
国家重点研发计划(2017YFB0902200)
吉林省教育厅科技项目(JJKH20180442KJ)
吉林省自然科学基金(20170101120JC)
国家电网公司科技项目(5228001700CW)。
关键词
主成分分析
电力系统规划
抽水蓄能电站
风力发电
principal component analysis
electric power system planning
pumped storage power plants
wind power