FIDIC施工合同条件下业主延期价调对项目成本/收益的影响研究——以巴基斯坦达苏水电站喀喇昆仑公路改线项目为例 被引量:1

Research on the Influence of Price Adjustment Elements on Project Cost/Revenue Under FIDIC Conditions of Contract for Construction and Delay Due to Owner——Case Study of the Pakistan Dasu Hydropower Karakoram Highway Recollection Project
下载PDF
导出
摘要 在FIDIC施工合同条件下,通过对价调公式中的三要素——调价项目、权重系数、价格指数的合理安排,可以较为公正地分摊业主和承包商所承担的市场价格涨跌风险。在业主原因导致工期延期的条件下,结合工程实例,从承包商角度对调价公式中的三要素以及汇率影响因子进行研究,以期对承包商投标、协议谈判时合理安排价调公式提供指导,规避风险、控制成本、增加收益。 Under FIDIC conditions of contract for construction, the risk of fluctuations in market prices borne by the owner and the contractor can be fairly allocated through a reasonable arrangement of three elements in price adjustment formula, i.e. price adjustment items, weight coefficient and price index. In the context of construction period being delayed due to the owner, this paper studies reasonable arrangement of three elements in the price adjustment formula and influence factors of exchange rate from the perspective of the Contractor through the case study, aiming at providing guidance for the contractor to make reasonable arrangement of price adjustment formula during bidding and agreement negotiation for better risk mitigation, cost reduction and revenue increase.
作者 李文涛 LI Wen-tao(China Civil Engineering Construction Corporation,Beijing 100038,China)
出处 《工程建设与设计》 2020年第24期175-177,共3页 Construction & Design for Engineering
关键词 FIDIC 施工合同 业主延期 价调公式 成本/收益 FIDIC contract for construction delay due to owner price adjustment cost/revenue
  • 相关文献

参考文献2

二级参考文献14

共引文献3

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部