摘要
为有效防止河道疏浚工程的水土流失,分别从管理措施、组织措施、现场措施、生态保护措施及监测措施这几个方面对无锡市五牧河疏浚工程的水土保持措施进行了分析,为相关工程提供参考。
In order to effectively prevent the soil and water loss in the river dredging project,the soil and water conservation measures of Wumu River dredging project in Wuxi City were analyzed from the aspects of management measures,organization measures,on-site measures,ecological protection measures and monitoring measures,so as to provide reference for relevant projects.
作者
杨一峰
YANG Yifeng(Jiangyin Water Conservancy Engineering Company,Wuxi 214400,China)
出处
《江苏水利》
2020年第S02期48-50,共3页
Jiangsu Water Resources
关键词
疏浚工程
水土保持
生态保护措施
监测措施
dredging project
water and soil conservation
ecological protection measures
monitoring measures