摘要
柱的钢筋造价在钢筋工程造价中占有较大比例。柱作为框架结构或框架剪力墙等结构中的“脊梁”,在钢筋工程量计算过程中准确计算尤为重要。为便于学习工程造价人员能熟练地计算钢筋工程量,提高工作效率,根据16G平法制图规则,对框架柱内钢筋的布置及有关钢筋工程量的计算过程及影响因素进行了归纳总结和分析。
The cost of reinforcement engineering accounts for about 20%of the total cost of civil engineering,even higher[1].The cost of the steel bar of the column accounts for much.of the cost of the steel bar.Therefore,as the"backbone"of the frame structure or the frame shear wall and other structures,the accurate calculation of the column is particularly important in the calculation of the steel bar quantities.In order to facilitate the study of engineering cost personnel to be proficient in calculating the quantities of steel bars and improve the work efficiency,according to the plan of 16g plan method,the arrangement of steel bars in frame columns and the calculation formula of the quantities of steel bars are summarized,interpreted and analyzed.
作者
罗敏
李斌
李勇萍
Luo Min;Li Bin;Li Yongping(Sichuan Engineering Technical College,Deyang,Sichuan,618000,China)
出处
《装备制造与教育》
2020年第4期47-50,共4页
Equipment Manufacturing and Education