摘要 本文从应开展规划环境影响评价工作的产业园区类型和规划类型、园区扩区后的规划环评范围、规划环评审查主体和审查权限、规划环评主体责任,以及规划环评与“三线一单”和项目环评联动等方面,系统梳理了当前园区规划环评实际工作中面临的问题和困惑,并分析了这些问题和对园区规划环评工作造成的影响。结合当前规划环评面临的形势和要求,针对当前规划环评管理存在的问题,从管理要求、技术要求和衔接要求等方面逐一提出了相关的对策建议。为推进解决当前规划环评工作面临的主要问题,提出了做实园区规划和规划环评工作、细化园区规划环评相关要求、动态调整“三线一单”成果三个方面的建议。 The problems and perplexities that faced by the current industrial park planning EIA were analyzed in this paper,from the aspects of park type and planning type,planning EIA scope after expansion,EIA review subject and review authority,main responsibility of planning EIA,linkage of planning EIA with“Three Lines and One List”and project EIA.And then the impacts on the environmental impact assessment of the park planning were analyzed.Combined with the current situation and requirements of planning EIA,aiming at the problems existing in the current planning EIA management,the relevant countermeasures and suggestions were put forward from the aspects of management requirements,technical requirements and connection requirements.In order to promote the solution of main problems in the current planning EIA work,suggestions were put forward from three aspects,i.e.implementing the park planning and planning EIA work,refining the relevant requirements of the park planning EIA,and dynamically adjusting the“Three Lines and One List”results.
作者 刘磊 张敏 韩力强 郑雯 LIU Lei;ZHANG Min;HAN Liqiang;ZHENG Wen(Appraisal Center for Environment&Engineering,Ministry of Ecology and Environment,Beijing 100012,China;Foreign Environmental Cooperation Center,Ministry of Ecology and Environment,Beijing 100035,China)
出处 《中国环境管理》 CSSCI 2020年第6期47-51,共5页 Chinese Journal of Environmental Management
基金 生态环境部财政项目“环评制度建设与技术支持”(2110107)。
关键词 产业园区 规划环评 主要问题 对策建议 industrial park planning EIA main problems countermeasure and suggestion
  • 相关文献

参考文献8

二级参考文献45

  • 1李悦红.开展环境影响后评价和跟踪评价[J].污染防治技术,2003,16(z2):160-162. 被引量:20
  • 2朱坦,吴婧.当前规划环境影响评价遇到的问题和几点建议[J].环境保护,2005,33(4):50-54. 被引量:42
  • 3孙艳军,陈新庚,莫创荣,高长波,桑燕鸿,彭晓春,范瑞.规划环境影响评价的发展机遇与挑战[J].环境保护,2005,33(8):42-45. 被引量:8
  • 4El-Naqa, A. Environmental impact assessment using rapid impact assessment matrix (R1AM) for Russeifa landfill, Jordan[[]. Environmental Geology, 2005, 47 (5): 632-639. 被引量:1
  • 5LYNN D. Wike, Dept Water Management & Environm, Michael H. Paller, Rapid Bioassessment and In Situ Bioassay: Cost Effective Tools for Environmental Impact Assessment [M]. Environmental Science and Technology, 2002, 253-262. 被引量:1
  • 6Asian Development Bank. Environmental Assessment Guidelines[M]. 2003. 被引量:1
  • 7WOOD C. Environmental impact assessment: a comparative review [M]. 2ed. New Jersey: Prentice Hall, 2002. 被引量:1
  • 8JOHN G. Sourcebook for the environmental assessment (EA) process [M]. United States Environmental Protection Agency, 1993. 被引量:1
  • 9JOHN G, RIKI T, ANDREW C. Introduction to environmental impact assessment [M].鞠美庭,王勇,王辉民译.北京:化学工业出版社,2007:66-68 被引量:1
  • 10OGENIS B, ED F. Municipal Environmental Management and Sustainable Development [M]//张明顺,张艳,陈大扬,等译.城市环境管理与可持续发展,北京:中国环境科学出版社.2003:28-30. 被引量:1

共引文献59

同被引文献123

引证文献17

二级引证文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部