期刊文献+

准噶尔盆地南缘GHW001井Φ473.1套管下入技术 被引量:2

GHW001 WELLφ473.1 CASING RUNNING TECHNOLOGY IN SOUTHERN MARGIN OF JUNG⁃GAR BASIN
下载PDF
导出
摘要 准噶尔盆地南缘深井地质工程复杂、必封点多,普遍采用五开甚至六开井身结构设计。其中,高泉区块GHW001井设计五开井身结构,二开在φ558.8井眼下φ473.1套管为新疆油田首次施工。区块上部存在巨厚砾石层,通井趟数多、耗时长,套管下放吨位大、摩阻高是套管下入的主要技术难点。GHW001井通过对扩眼参数配合及通井钻具刚度进行设计,制定合理的下套管施工方案,保证了井眼畅通,减小了套管下放摩阻。该层套管安全顺利地下至预定井深,创下准噶尔盆地φ473.1套管下入重量和深度的记录,也为新疆油田后期类似井眼中完施工提供重要借鉴作用。 The deep wells in the southern margin of the Junggar Basin have complicated geological and engineering prob⁃lems,and generally adopt five or even six wellbore structure design.The GHW001 well in the Gaoquan district is designed with a five-open wellbore structure,and runningφ473.1 casing inφ558.8 wellbore is the first attempt in Xinjiang Oilfield.The huge thick gravel layer,time-consuming wiper trip and large tonnage of the casing and high friction resistance are the main technical difficulties of casing running.The optimization which including hole-reaming parameters,BHA design,rea⁃sonable casing running plan,is made to ensure borehole smoothly and reduce the resistance.The casing is safely and smooth⁃ly run down to the predetermined well depth,setting a record of the weight and depth of theφ473.1 casing in the Junggar Ba⁃sin,and also providing an important reference for the other completion of similar wellbore construction in Xinjiang Oilfield.
作者 张晨 兰祖权 罗科海 王雷 张茂林 ZHANG Chen;LAN Zu-quan;LUO Ke-hai(Engineering Technology Research Institute of XEDC,Kara-may,Xinjiang 834000)
出处 《新疆石油天然气》 CAS 2020年第4期44-46,I0003,共4页 Xinjiang Oil & Gas
关键词 准噶尔盆地南缘 套管下入 钻后扩眼 钻具刚度 Southern margin of Junggar Basin Casing running Reaming after drilling BHA stiffness
  • 相关文献

参考文献6

二级参考文献16

共引文献43

同被引文献38

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部