公路工程施工变更索赔管理的探讨

Discussion on Change Claim Management in Highway Engineering Construction
下载PDF
导出
摘要 公路工程项目本身具有周期长、规模大、工种多、施工环境复杂多变等情况,如果出现突发问题,就可能会造成工期延误,进而出现各类施工变更问题,造成一定的成本影响和经济损失。本文以此为出发点,围绕公路工程变更索赔的相关概念内容,探讨现阶段公路工程施工变更索赔存在的具体问题及原因,并基于问题展开对策分析。 Highway engineering projects have long periods,large scales,multiple types of work,and complex and changeable construction environments.If there is a sudden problem,it may cause a delay in the construction period,and then various construction changes,causing a certain cost impact and economic loss.This article takes this as the starting point,and discusses the specific problems and causes of the highway engineering construction alteration claim at the present stage,and analyzes the countermeasures based on the problem.
作者 胡颖豪 HU Ying-hao(CCCC Second Highway Engineering Co.,Ltd.,Xi'an 710065,China)
出处 《价值工程》 2020年第33期23-24,共2页 Value Engineering
关键词 公路工程 变更索赔管理 施工设计 highway engineering change claim management construction design
  • 相关文献

参考文献6

二级参考文献20

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部