摘要
5G基站密度增大给铁塔公司在选址、建站等方面带来高额投资压力,5G无线主设备重量大、耗电高等特性给铁塔公司在天面挂载、外市电容量、机房空间等配套资源的快速交付能力方面带来挑战;本文通过对5G需求及困难的分析,进行应对策略和解决方案的阐述,论证了铁塔公司5G基站建设的承接能力,并在未来5G时代发挥更大作用进行展望。
The increasing density of 5G base stations has put high investment pressure on the Tower Company in siting selection and constructing.The characteristics of the large weight of 5G wireless main equipment and the high power consumption have brought challenges to ability of Tower Company in deliver products rapidly supporting resources such as tower resources,power capacity and machine room space;By analyzing the requirements and difficulties of 5G,this paper demonstrates the capacity of constructing 5G base station of Tower Company,and makes a bigger role in the future 5G era.
作者
王鑫
Wang Xin(China Tower Ltd.Qinghai Branch,Xining 810007,Qinghai Province,China)
出处
《信息通信》
2020年第10期235-237,共3页
Information & Communications
关键词
宏基站
需求
机房改造
基础配套
Macro Base Station
Requirement
Machine room Upgrade
Supporting resources.