5GOODCHILD A V, DAGANZO C F. Double-cycling strategies for container ships and their effect on ship loading and unloading operations[J]. Transportation Science, 2006, 40(4): 473-483. 被引量:1
6GOODCHILD A V, DAGANZO C F. Crane double cycling in container ports: planning methods and evaluation[J]. Trans portation Research Part B: Methodological, 2007, 41 (8) : 875-891. 被引量:1
7BISH E K. A multiple-crane-constrained scheduling problem in a container terminal[J]. European Journal of Operational Research, 2003, 144(1): 83-107. 被引量:1
8LEE D H, WANG H Q, MIAO L X. Quay crane scheduling with noninterference constraints in port container terminals[J]. Transportation Research Part E: Logistics and Transportation Review, 2008, 44(1): 124-135. 被引量:1
9ZENG Qing cheng, YANG Zhong zhen. Integrating simulation and optimization to schedule loading operations in container terminals [J]. Computers and Operations Research 2009, 36(6): 1935-1944. 被引量:1
10LAU H Y K, ZHAO Y. Integrated scheduling of handling equipment at automated container terminals[J]. International Journal of Production Economics, 2008, 112(2): 665 682. 被引量:1