期刊文献+

9103采面下部老空区冒落带、裂隙带高度探测 被引量:3

Application of Borehole Leakage Method in Detection of Caving and Fracture Zone of No.15 Coal Seam
下载PDF
导出
摘要 9103工作面位于15#煤层采空区上方,为了分析15#煤层开采对上覆9103回采工作面底板稳定性影响,采用钻孔渗漏法对15#煤冒落带、裂隙带高度进行探测,并用钻孔窥视方法验证,结果表明:15#煤层裂隙带、冒落带发育高度分别为10.41 m,4.11 m,9#煤层底板下方仍有约20.48 m厚稳定岩层,预计15#采空区不会给9#煤层开采带来不利影响。 In order to analyze the effect of No.15 coal seam mining on the floor stability of the overlying 9103 mining face,the author proposes the borehole leakage method to detect the heights of caving zone and fracture zone and verify with borehole peeping method,whose results show that the developmental height of fracture zone and caving zone are 10.41 m and 4.11 m respectively,with 20.48 m-thick stable rock layer under the floor of No.9 coal seam and no adverse effects of No.15 goaf on No.9 coal seam mining.
作者 张斌 Zhang Bin(Gaizhou Coal Industry Co.,Ltd.,Shanxi Coal Transportation and Sales Group.,Gaoping,Shanxi 048400)
出处 《江西煤炭科技》 2020年第4期182-184,187,共4页 Jiangxi Coal Science & Technology
关键词 采空区 冒落带高度 裂隙带高度 钻孔渗漏法 钻孔窥视 goaf height of caving zone height of fracture zone borehole leakage borehole peeping
  • 相关文献

参考文献5

二级参考文献25

共引文献14

同被引文献21

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部