摘要
文章从火电厂烟气湿法脱硫系统设备的结构、材质、工艺等方面阐述和分析了脱硫塔在运行中存在的问题和正确处理方法及措施,为火力发电厂脱硫机组安全运行提供借鉴性意见和建议。
This paper expounds and analyzes the problems existing in the operation of FGD tower and the correct treatment methods and measures from the aspects of equipment structure,material and technology of fl ue gas wet desulfurization system in thermal power plant,so as to provide reference opinions and suggestions for safe operation of desulfurization unit in thermal power plant.
出处
《电力系统装备》
2020年第19期134-135,共2页
Electric Power System Equipment
关键词
湿法脱硫
玻璃鳞片
抗腐蚀性
浆液密度
含固量
液位
wet desulfurization
glass fl ake
corrosion resistance
slurry density
solid content
liquid level