穿江地铁中间风井对防洪堤的结构影响分析 被引量:1

Analysis of Influence of Intermediate Air Shaft of Crossing River Subway on Flood Bank Structure
下载PDF
导出
摘要 为解决穿江地铁中间风井对防洪堤结构影响的高风险问题,结合福州地铁2号线厚庭站~橘园洲站区间中间风井,利用ANSYS有限元法,对风井施工引起的防洪堤的变形和应力进行分析,并分析风井自身结构稳定的薄弱区,为防洪堤的安全运行提供保障,同时也对类似穿江地铁风井工程的设计和建设具有参考价值。 In order to solve the high-risk problem of the influence of the middle air shaft of the crossing river subway on the structure of the flood bank,combined with the middle air shaft in the interval between Houting Station and Juyuanzhou Station of Fuzhou Metro Line 2,the ANSYS finite element method is used to analyze the deformation and stress of the flood dike caused by the construction of the wind shaft,and analyze the weak area of the structural stability of the wind shaft itself to provide guarantee for the safe operation of the flood dike,at the same time,it also has reference value for the design and construction of similar cross-jiang subway air shaft projects.
作者 黄梅琼 Huang Meiqiong(Fujian Provincial Investigation,Design&Research Institute of Water Conservancy&Hydropower,Fuzhou 350001,Fujian)
出处 《陕西水利》 2020年第10期7-9,共3页 Shaanxi Water Resources
关键词 防洪堤 穿江地铁 风井 有限元 结构稳定 Flood bank crossing river subway air shaft finite element structural stability
  • 相关文献

参考文献4

二级参考文献20

共引文献2

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部