摘要 本文采用"隔油调节+厌氧酸化+生物接触氧化+混凝沉淀+超滤"组合工艺处理混凝土管桩综合废水,介绍了处理工艺流程、工艺参数以及最终处理效果。实际运行结果表明,出水COD、BOD5分别为50、9.0 mg/L、SS、氨氮、动植物油以及石油类的平均质量浓度分别为25、3.0、0.5、0.3 mg/L,出水水质优于广东省水污染物排放限值(DB44/26-2001)第二时段一级排放标准要求,项目总投资80.7万元,总运行费用为4.08元/m3,该工程可对同类废水的治理提供借鉴。 In this paper,the concrete pipe pile comprehensive wastewater is treated by oil separation regulation+anaerobic acidification+biological contact oxidation+coagulation sedimentation+ultrafiltration combined process.The treatment process,process parameters and final treatment effects are introduced.The results showed that the effluent COD,BOD5,SS,ammonia nitrogen,animal and vegetable oil,and petroleum are 50,9,25,3,0.5,and 0.3 mg/L,respectively,the effluent water quality is better than the requirements of first-level discharge standard for the second period of"Guangdong Province Water Pollutant discharge Limit(DB44/26-2001)",the total investment of the project is 807,000 yuan,and the total operating cost is 4.08 yuan/m^3.The project can provide reference for the treatment of similar wastewater.
作者 高湘 刘晨宇 梁玉杰 向长辉 董宏宇 甄卓文 GAO Xiang;LIU Chenyu;LIANG Yujie;XIANG Changhui;DONG Hongyu;ZHEN Zhuowen(School of Enviroumental and Municipal Engineering,Xi’an University of Architecture and Technology,Xi'an 710055,Chinu;Xinlv Environmental Industrial Development Corporation,Jiangmen 529100,China)
出处 《水处理技术》 CAS CSCD 北大核心 2020年第10期133-136,共4页 Technology of Water Treatment
关键词 混凝土管桩综合废水 厌氧酸化 生物接触氧化 超滤 tubular pile comprehensive wastewater anaerobic acidification biological contact oxidation ultrafiltration
  • 相关文献

参考文献6

二级参考文献15

共引文献3

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部