期刊文献+

船闸闸室结构施工过程可靠度分析

Analysis on the Reliability of the Construction Process of Ship Lock Chamber Structure
下载PDF
导出
摘要 为探讨船闸施工过程的可靠度,本文采用蒙特卡罗法对船闸闸室的施工过程进行可靠度分析,对闸室施工过程中的主要失效模式——模板断裂进行分析,通过工程实例,建立极限状态功能函数,且基于MATLAB程序,计算得到失效概率3.391%、可靠度指标1.826。 In order to discuss the reliability of ship lock construction,Monte Carlo method was used to analyze the reliability of the construction process.In this paper,the main failure mode in the lock construction-crack of the mold plate was analyzed,and the limit state function was established through an engineering case.The failure probability and reliability index were calculated by MATLAB program,their values were 3.391%and 1.826,respectively.
作者 黄建红 纪献柯 Huang Jianhong;Ji Xianke(Jiangsu Kexing Project Management Co.,Ltd.,Nanjing Jiangsu 210029,China)
出处 《城市建筑》 2020年第23期68-69,共2页 Urbanism and Architecture
关键词 蒙特卡罗 可靠度 模板断裂 失效概率 Monte Carlo reliability crack of the mold plate failure probability
  • 相关文献

参考文献3

二级参考文献16

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部