期刊文献+

双面叠合剪力墙结构住宅工程施工技术研究 被引量:4

Research on Construction Technology of Double-Sided Superimposed Shear Wall Structure Residential Project
下载PDF
导出
摘要 传统的套筒灌浆接头预制剪力墙施工质量问题层出不穷,质量大,需要的吊装设备昂贵。双面叠合剪力墙的空腔结构使得墙板吊装时的厚度仅为10 cm。它取代了套筒灌浆接头,直接采用现浇接头。该技术在南京某保障房项目得到应用,现将该技术的应用经验与同行分享。 The construction quality problem of prefabricated shear wall with traditional sleeve grouting joint is endless.The cavity structure of double-sided superimposed shear wall makes the thickness of the wall plate only 10cm when it is hoisted.It replaces the sleeve grouting joint and directly adopts the castin-place joint.This technology has been applied in an indemnificatory housing project in Nanjing,now we share the application experience of this technology with our peers.
作者 佘远逢 SHE Yuanfeng(Jiangning District,Nanjing City Construction Engineering Quality Supervision Station,Nanjing Jiangsu 211100,China)
出处 《工程质量》 2020年第10期72-75,共4页 Construction Quality
关键词 叠合墙板 装配式结构 预制墙板接头 laminated wallboard fabricated structure precast wall panel joints
  • 相关文献

参考文献1

共引文献6

同被引文献17

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部