摘要
经济社会的快速发展推动了城市化的进程,在城市建设过程中,交通体系的作用是不言而喻的。当前,越来越多的城市开始建设地铁工程,而盾构法作为地铁建设的重要工法,应用非常广泛。盾构施工过程中的测量工作是确保地铁隧道贯通的关键项目,为确保盾构掘进能够严格依照设计标准施工,合理控制误差,针对地铁盾构施工中的每一步工作进行有效的测量,保证地铁工程建设成效。论文介绍了盾构施工及测量情况,分析了施工前、中、后地铁盾构测量应用。
The rapid development of economy and society promotes the process of urbanization.In the process of urban construction,the role of traffic system is self-evident.At present,more and more cities begin to construct subway projects,and shield method,as an important construction method of subway construction,is widely used.The measurement work in the process of shield construction is the key project to ensure the subway tunnel through.In order to ensure that the shield tunneling can be constructed in strict accordance with the design standards and reasonably control the error,effective measurement is carried out for each step of the subway shield construction to ensure the construction effect of the subway project.This paper introduces the shield construction and measurement,and analyzes the application of metro shield measurement before,during and after the construction.
作者
陈冬
CHEN Dong(China Railway Second Bureau Group Co.Ltd.,Chengtong Company,Chengdu 610500,China)
出处
《工程建设与设计》
2020年第21期79-80,89,共3页
Construction & Design for Engineering
关键词
地铁工程
盾构施工
测量方法
应用
subway project
shield construction
measurement methods
application