期刊文献+

综采工作面过断层时的顶板控制措施 被引量:11

Control Measures of Roof Over Fault in Fully Mechanized Mining Face
下载PDF
导出
摘要 5306工作面揭露F5断层时顶板及煤壁出现破碎现象,工作面顶板维护难度大,片帮严重,移架困难。对断层处顶板采取深孔预裂,提出了铺设聚氨酯纤维网配套JW型锚索梁以及超前支护措施,提高了断层处顶板的稳定性,取得了较好效果。 When the F5 fault is exposed in 5306 working face,the roof and coal wall are broken.It is difficult to maintain the roof of the working face,the spalling is serious and the frame moving is difficult.Deep hole pre cracking is adopted for the roof of the fault,and the laying of polyurethane fiber mesh supporting JW type anchor cable beam and advanced support measures are put forward,which improves the stability of the roof at the fault and achieves good results.
作者 赵福栋 Zhao Fudong(Zengzifang Coal Mine,Tiefeng Coal Industry,Datong Coal Mine Group,Shanxi Datong 037200)
出处 《山东煤炭科技》 2020年第9期54-55,58,共3页 Shandong Coal Science and Technology
关键词 综采 断层 联合 支护 fully mechanized mining faults union support
  • 相关文献

参考文献5

二级参考文献23

共引文献18

同被引文献50

引证文献11

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部