摘要
现行《水利工程概预算补充定额(掘进机施工隧洞工程)》中敞开式TBM掘进预算定额,无法满足引汉济渭工程秦岭隧洞岭南TBM掘进造价管理。结合秦岭隧洞岭南TBM施工段工程定额测定进行分析总结,为水利水电超长隧洞工程定额测定提供参考。
The open TBM tunneling budget quota in the current"Water Conservancy Project Estimated Budget Supplementary Quota(Tunnel Construction by Tunnelling Machine)"cannot meet the cost management of TBM tunneling in the Qinling Tunnel of the Han-to-Wei Diversion Project.Combining with the determination of the engineering quota of the Lingnan TBM construction section of the Qinling Tunnel,the analysis and summary provide a reference for the determination of the engineering quota of the water conservancy and hydropower super-long tunnel.
作者
李保明
Li Baoming(Shaanxi Yinhan Jiwei Engineering Construction Co.,Ltd,Xi'an 710010,Shaanxi)
出处
《陕西水利》
2020年第9期177-179,共3页
Shaanxi Water Resources
关键词
工程定额
测定
TBM施工
秦岭隧洞
Engineering quota
determination
TBM construction
Qinling tunnel