摘要
上海虹桥国际机场T1航站楼原楼前高架上引桥改造区域位于航站楼改造、交通中心、市政一标3个工程交会处,且关系到整个航站区的全面通航。针对不同专业交叉施工、引桥改造场地狭小、工期紧张等不利条件,经过前期策划和对引桥改造影响的充分分析,制定了可行的总体施工部署,有效地保障了引桥改造在既定的工期内顺利完成。
The reconstruction area of the elevated upper approach bridge in front of the original T1 terminal building of Shanghai Hongqiao International Airport is located at the intersection of terminal reconstruction,traffic center and municipal first bid section,which is related to the comprehensive navigation of the whole terminal area.In view of the unfavorable conditions such as cross construction of different specialties,narrow site for approach bridge reconstruction and short construction period,the feasible overall construction deployment is formulated after the preliminary planning and full analysis of the impact on the approach bridge reconstruction,which effectively ensures the smooth completion of the approach bridge reconstruction within the scheduled construction period.
作者
邢俊
XING Jun(Shanghai Construction Group Co.,Ltd.,Shanghai 200080,China)
出处
《建筑施工》
2020年第8期1531-1533,共3页
Building Construction
关键词
不停航
总体部署
施工组织
多专业
流水施工
without suspension of flight
overall deployment
construction organization
multi-specialties
flow construction