引桥不停航改造对航站区项目群的影响分析及施工组织研究 被引量:3

Influence Analysis of Approach Bridge Reconstruction Without Suspension of Flight on Project Group in Airport Terminal Area and Construction Organization Research
下载PDF
导出
摘要 上海虹桥国际机场T1航站楼原楼前高架上引桥改造区域位于航站楼改造、交通中心、市政一标3个工程交会处,且关系到整个航站区的全面通航。针对不同专业交叉施工、引桥改造场地狭小、工期紧张等不利条件,经过前期策划和对引桥改造影响的充分分析,制定了可行的总体施工部署,有效地保障了引桥改造在既定的工期内顺利完成。 The reconstruction area of the elevated upper approach bridge in front of the original T1 terminal building of Shanghai Hongqiao International Airport is located at the intersection of terminal reconstruction,traffic center and municipal first bid section,which is related to the comprehensive navigation of the whole terminal area.In view of the unfavorable conditions such as cross construction of different specialties,narrow site for approach bridge reconstruction and short construction period,the feasible overall construction deployment is formulated after the preliminary planning and full analysis of the impact on the approach bridge reconstruction,which effectively ensures the smooth completion of the approach bridge reconstruction within the scheduled construction period.
作者 邢俊 XING Jun(Shanghai Construction Group Co.,Ltd.,Shanghai 200080,China)
出处 《建筑施工》 2020年第8期1531-1533,共3页 Building Construction
关键词 不停航 总体部署 施工组织 多专业 流水施工 without suspension of flight overall deployment construction organization multi-specialties flow construction
  • 相关文献

二级参考文献18

共引文献21

同被引文献12

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部