几内亚苏阿皮蒂水利枢纽电站厂房采用坝后地面式厂房,布置于左岸引水发电坝段坝后,总装机容量450 MW,安装4台单机容量112.50 MW的立轴混流式水轮发电机组。设计人员在可研阶段设计的基础上对厂房整体尺寸、出线及电气设备布置、集水井位置、尾水渠型式等进行了优化,使厂房布置更加合理紧凑,且降低了工程造价。
In Souapiti Hydropower Station in Guinea,the behind-dam ground type powerhouse is arranged behind the left bank power generation sections with four vertical shaft mixed-flow hydro-turbine generator units and the total installed capacity of 450 MW.Based on the design of the feasibility study stage,optimizations are implemented on the overall dimensions of the powerhouse,the layout of the outlet and electrical equipment,the location of the collection well,and the type of the tail water channel.After the optimization,the powerhouse layout is more reasonable and compact,and of a lower cost.
作者
翟利军
张萌
ZHAI Lijun;ZHANG Meng(Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, China)
出处
《水电与新能源》
2020年第8期24-27,共4页
Hydropower and New Energy
关键词
厂房布置
优化设计
苏阿皮蒂水电站
powerhouse layout
optimization design
Souapiti Hydropower Station