摘要
随着煤炭行业的发展,井下地质条件越来越复杂,为了优化采煤工作面设计,提高出煤质量,新三矿通过变更出煤系统,更大限度的提高生产效率,实现安全生产。本文简单介绍了162316工作面随外推需求将出煤系统改至溜子道出煤眼,改出煤系统期间需拆除安装机电设备实践为例,归纳现场采取的有效措施,为煤矿企业提供了借鉴意义。
With the development of the coal industry,underground geological conditions have become more and more complex.In order to optimize the design of coal mining face and improve the quality of coal production,the coal production system of the new No.3 Mine has been changed to improve production efficiency and achieve safe production.This article briefly introduces the change of the coal production system to hurry channel coal exit with the extrapolation need of 162316 working face.The practice of removing and installing electromechanical equipment during the coal production system is takes as an example.It summarizes the effective measures taken on site and provides a reference for coal mine enterprises.
作者
郭军民
GUO Jun-min(New No.3 Mine of Jizhong Energy Fengfeng Group,Handan 056200,China)
出处
《价值工程》
2020年第24期159-160,共2页
Value Engineering
关键词
更改出煤系统
设备安装
有效措施
to change coal production system
equipment installation
effective measures