摘要
对华中科技大学同济医学院光谷院区相关应急交通及导视标牌、发热门诊、医护病患通道、负压隔离病房等隔离区进行快速规划和改造实践,实现院区应急管理卫生资源的优化配置,通过明确交通流线、设置独立发热门诊、改造隔离病房、加设临建住所、使用期进行维护保养,为医护和患者提供优质的医疗保障,总结医院既有病房快速规划和改造成隔离病房的经验。
Rapid planning and reconstruction of the isolation areas is carried out,such as emergency traffic and guide signs,fever clinic,medical patient access and negative pressure isolation ward in Guanggu Hospital of Tongji Medical College of Huazhong University of Science and Technology,the allocation of hospital emergency management and health resources is optimized,by clarifying traffic flow lines,setting up independent fever clinics,transforming isolation wards,adding temporary residences and maintaining the service life,to provide quality health care for patients and doctors,it also summarizes the experience of rapid planning and reconstruction of existing wards into isolation wards.
作者
张正林
叶勇
张飞
林华敏
李志正
ZHANG Zhenglin;YE Yong;ZHANG Fei;LIN Huamin;LI Zhizheng(General Construction Co.of CCTEB Group Co,Ltd,Wuhan,Hubei 430064,China)
出处
《施工技术》
CAS
2020年第12期54-56,共3页
Construction Technology
基金
中建三局2020年度科技研发课题(CSCEC3B-2020-28):应急呼吸道传染病医院快速建造技术与总承包管理。