火神山医院设计协调管理与优化 被引量:2

Design Management and Optimization of Huoshenshan Hospital
下载PDF
导出
摘要 武汉火神山医院建设工期异常紧张,为尽全力保工期、保质量完成施工任务,项目设计阶段采取高效协同的管理思路,在设计管理中通过设计策划,进行科学合理地组织。结合EPC模式管理理念,满足设计使用功能及现场进度要求的基本前提下,深度融合设计与施工可建造性及资源招采。通过进一步比选及优化设计方案,全过程助推项目实施,保障项目顺利完成。 The construction period of W uhan Huoshenshan Hospital is extremely tight,in order to make effort to ensure the construction period and quality,in the stage of project design,a highly efficient and coordinated management method is adopted,in the design management through the design planning,the scientific and reasonable organization is carried out.Combined with the EPC mode management philosophy,under the basic premise of meeting the requirements of design function and site schedule,the deep integration of design and construction constructability and resource procurement are carried out.Through the further comparison and optimization of the design scheme,the whole process promotes the implementation of the project,the smooth completion is ensured.
作者 李鸣 杨华荣 杜力 张坤 李明威 宋志 LI Ming;YANG Huarong;DU Li;ZHANG Kun;LI Mingwei;SONG Zhi(General Construction Co.of CCTEB Group Co.,Ltd,Wuhan,Hubei 430064,China)
出处 《施工技术》 CAS 2020年第12期4-7,共4页 Construction Technology
基金 中建三局2020年度科技研发课题(CSCEC3B-2020-28):应急呼吸道传染病医院快速建造技术与总承包管理。
关键词 医院 工程总承包 设计 管理 优化 hospitals engineering procurement construction(EPC) design management optimization
  • 相关文献

参考文献4

二级参考文献1

  • 1.中华人民共和国传染病防治法[Z].,2004-08-28.. 被引量:1

共引文献68

同被引文献30

引证文献2

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部