期刊文献+

考虑机床调整和工件批量加工的车间调度问题模型研究 被引量:3

Research on model of workshop scheduling problem considering machine tool adjustment and batch processing
下载PDF
导出
摘要 针对工件品种多、工序复杂,机床在批量同种工序首件加工前需进行调整等问题,研究出一种以机床总能耗最小和工件的最大完工时间最小为优化目标的生产调度模型。使用遗传算法对提出的模型进行快速精确求解。运用Matlab软件平台对实际案例进行仿真,将新旧模型的计算结果进行对比,结果表明建立的模型是有效和实用的,能更有效地指导实际生产。 Aiming at the problems of multiple workpiece types,small batches,large process flexibility,and whether the machine tool needs to be adjusted,a production scheduling model with the total energy consumption of the machine tool and the completion time of the workpiece as the optimization goals was developed.An improved genetic algorithm is designed to solve the proposed model quickly and accurately.The Matlab software platform is used to simulate actual cases and calculates data of the new and old models.The results show that the established model is effective and practical,and can more effectively guide the actual production.
作者 单东日 王玉伟 高立营 童灿 SHAN Dongri;WANG Yuwei;GAO Liying;TONG Can(School of Electronic and Information Engineering,Qilu University of Technology(Shandong Academy of Sciences),Jinan 250353,CHN;School of Mechanical and Automotive Engineering,Qilu University of Technology(Shandong Academy of Sciences),Jinan 250353,CHN)
出处 《制造技术与机床》 北大核心 2020年第8期151-154,161,共5页 Manufacturing Technology & Machine Tool
基金 山东省重点研发计划(2017CXGC0604) 山东省自主创新及成果转化专项(2015ZDXX0101G06) 山东省高等学校科技发展计划(J18KA032)。
关键词 柔性作业车间调度模型 能耗 完工时间 遗传算法 flexible job shop scheduling model energy consumption completion time genetic algorithm
  • 相关文献

参考文献8

二级参考文献79

  • 1Blazewicz J, Domschke W, Pesch E. The Job Shop Scheduling Problem: Conventional and New Solution Techniques. European Journal of Operational Research, 1996, 93(1):1~33 被引量:1
  • 2Jain A S, Meeran S. Deterministic Job-Shop Scheduling:Past,Present and Future. European Journal of Operational Research. 1999,113(2): 390~434 被引量:1
  • 3Carlier J, Pinson F. An Algorithm for Solving the Job-Shop Problem. Management Science, 1989,35(2): 164~176 被引量:1
  • 4Laarhoven P V, Aarts E, Lenstra J K. Job Shop Scheduling by Simulated Annealing. Operations Research, 1992,40(1): 113~125 被引量:1
  • 5Nowicki E, Smutnicki C. A Fast Taboo Search Algorithm for the Job Shop Problem. Management Science, 1996, 42(6): 797~813 被引量:1
  • 6Rodammer F A, White K P. A Recent Survey of Production Scheduling. IEEE Trans.SMC, 1988,18(6): 841~851 被引量:1
  • 7王凌. 智能优化算法及其应用. 北京:清华大学出版社, 2001 被引量:1
  • 8Holland J H. Adaptation in Nartural and Artifical System. Massachusett: MIT Press, 1975 被引量:1
  • 9Davis L. Job Shop Scheduling with Genetic Algorithms.International Conference on Genetic Algorithms and Their Application, Hillsdale, 1985 被引量:1
  • 10Gen M, Tsujimura Y, Kubota E. Solving Job-Shop Scheduling Problems by Genetic Algorithm. The 16th Int.Conf. on Computer and Industrial Engineering, Vancouver,1994 被引量:1

共引文献1448

同被引文献21

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部