为实现大采高工作面安全地过地质构造,通过提前采取铺网、搭台,构造段采取主动支护和一系列管理措施,达到了工作面安全高效通过地质构造的效果,为大采高工艺积累了经验,确保了矿井的高效生产,取得了良好的经济效益。
In order to realize the safety of the large mining face crossing the over-geological structure, the safety and high efficiency of the working face through the geological structure are realized by taking the active support of laying the net,setting up the platform, taking the structural section in advance, and a series of management measures so as to accumulate experience for the high mining process and ensure the efficient production and economic benefit of the mine.
作者
王小雷
Wang Xiaolei(Yangquan Coal Mine Group,Yangquan Shanxi 048008)
出处
《机械管理开发》
2020年第7期158-159,共2页
Mechanical Management and Development
关键词
大采高
地质构造
注浆
large mining
geological structure
slip casting