期刊文献+

双拉薄膜生产线的监控系统设计

Design of Image Monitoring System for Double Pull Film Production Line
下载PDF
导出
摘要 通过对比和优化不同的双拉薄膜实验生产线安装方案,确定在横拉区域前中后部各安装2个摄像头即共6个摄像头。根据需求,选择了HZ-SL水冷防护罩、acA2000-50gc-Basler ace工业相机以及Computer Lens(TG3Z2910FCS-IR)镜头。经过监控系统的硬件安排和软件设计,搭建横拉区间的薄膜破损图像实时监控系统,实现诊断报警。 By comparing and optimizing the installation schemes of different double-pull film experimental production lines,it was determined that 2 cameras(6 cameras in total)were installed in the front,middle and rear of the horizontal drawing area.According to the needs,choose HZ-SL water-cooled protective cover,acA2000-50gc-Basler ace industrial camera and Computer Lens(TG3Z2910FCS-IR)lens.After the hardware arrangement and software design of the monitoring system,a real-time monitoring system for the film damage image in the horizontal pulling zone was built to realize the diagnosis and alarm.
作者 韦菲菲 李云鹏 李雪明 王宁 黄帆乾 李岩舟 WEI Fei-fei;LI Yun-peng;LI Xue-ping;WANG Ning;Huang Fan-qian;LI Yan-zhou(College of Mechanical Engineering,Nanning Guangxi 530004,China;Sinochem Blue Sky Fluorine Material Co.,Ltd.,Shaoxing Zhejiang 312300,China;Guilin Grice Technology Co.,Ltd,Guilin Guangxi 541004,China)
出处 《装备制造技术》 2020年第5期5-9,共5页 Equipment Manufacturing Technology
基金 广西科技重大专项(编号:桂科AA18242011).
关键词 双拉薄膜 摄像头安装 实时监控 图像分析 double pull film camera installation real time monitoring image analysis
  • 相关文献

参考文献7

二级参考文献14

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部