抽蓄电站场内道路设计重难点探究 被引量:1

Research on the major and difficult points of road design in pumped storage power station
下载PDF
导出
摘要 结合新疆哈密抽水蓄能电站上下库连接路设计情况,针对抽蓄电站场内道路设计过程中遇到的问题,从场内道路选线、路基防护及排水设计、路面设计、桥涵隧道设计等方面进行总结,主要目的在于更好的推动抽蓄电站场内道路设计质量的发展与进步。 The article mainly combines the design of the connecting roads of the upper and lower reservoirs of the Hami Pumped Storage Power Station in Xinjiang,and focuses on the problems encountered during the road design of the pumped storage power plant.To summarize in other aspects,the main purpose is to better promote the development and progress of the road design quality of the pumped storage power plant.
作者 吴远鹏 Wu Yuanpeng(Northwest Survey and Design Institute of China Power Construction Corporation,Xi’an 710065,China)
出处 《山西建筑》 2020年第15期123-124,共2页 Shanxi Architecture
关键词 抽蓄电站 场内道路 路线设计 pumped storage power station on-site traffic road route design