摘要
目前关于EPC工程中标后经财政评审确定合同价款已经越来越多,进行边设计、边施工、边财评模式不仅成为缩短项目的施工工期,更有利于业主控制成本和质量等,但是对施工单位存在一定的风险等。针对关于EPC工程中标后经财政评审确定合同价款模式阐述对项目各参与方的利弊进行了分析和论述。
At present, there is more and more contract money determined by financial evaluation after winning the bid of EPC project. The mode of design, construction and financial evaluation at the same time not only shortens the construction period of project, but also makes for the owner to control the cost and quality. But there is a certain risk for the construction units. Aiming at the mode of contract money determined by financial evaluation after winning the bid of EPC project, the advantages and disadvantages of each participant in the project are expounded, analyzed and discussed.
出处
《城市道桥与防洪》
2020年第7期208-210,M0020,共4页
Urban Roads Bridges & Flood Control
关键词
EPC工程
合同价款模式
财政评审
PEC project
mode of contract money
financial evaluation