摘要
本文结合成都地铁6号线一、二期工程机电装修工程机电5标项目实际,针对BIM技术进行机电管线综合排布深化设计问题,在实施流程、各阶段实施要点、成果输出、二维和三维管综的比较、机电工程BIM应用特点层面积极探索运用BIM技术进行机电管综深化设计的途径及经验,并总结出一套可以推广复制的标准实施方法,可操作且适用性强.
In the paper,combining with the actual situation of Lot 5 m echanical and electrical decoration engineering in the first and second phases of Chengdu Metro Line 6,the author actively explores the way and experience of using BIM technology to deepen the design of m echanical and electrical pipeline in the aspects of the implementation process,key points of implementation in each stage,output of achievem ents,comparison between 2D and 3D integrated managem ent,and the application characteristics of BIM in mechanical and electrical engineering,with a view to solve the problems of deepening the design for comprehensive layout of electrical and mechanical pipeline.Moreover,a set of standard implementation methods that can be popularized and copied are summarized,which are operable and applicable.
作者
李燕粉
王文灏
LI Yanfen;WANG Wenhao(China Railway 15th Bureau Group City Construction Engineering Co.Ltd.,Luoyang Henan 471000,China;Zhengzhou University,Zhengzhou Henan 450002,China)
出处
《铁道建筑技术》
2020年第6期72-75,共4页
Railway Construction Technology
基金
中铁十五局集团有限公司科技研究开发计划项目(2019C39)。
关键词
BIM
机电管综
装修
深化设计
BIM
electrical and mechanical pipeline integration
decoration
deepening the design