摘要
针对污水处理厂资料缺乏的情况,提出线性关系法和出水量预测法来预测污水处理厂的再生水可利用量,并通过建立起人均出水量的概念,对这2种方法进行对比、相互验证,为今后类似资料缺乏的污水处理厂预测再生水量提供参考依据,并以博州金三角工业园区规划水资源论证为例,来验证上述方法的可行性。
In view of the lack of data in sewage treatment plants,this paper proposes the linear relation method and the water yield prediction method to predict the renewable water availability of sewage treatment plants,and through the establishment of the per capita water yield concept,the two methods are compared and mutually verified.This paper provides a reference for the prediction of reclaimed water amount in case of the lack of data of similar sewage treatment plants in the future,and takes water resources demonstration in Bozhou Golden Triangle Industrial Park planning as an example to verify the feasibility of the above method.
作者
田龙
TIAN Long(Xinjiang Water Resources and Hydropower Investigation Design and Research Institute, Urumqi 830000,China)
出处
《西北水电》
2020年第3期29-31,36,共4页
Northwest Hydropower
关键词
再生水
出水量预测
规划水资源论证
reclaimed water
predicted yield
demonstration of planning water resources