以吉尔吉斯斯坦某水电站改造项目作为工程实例,研究水电站550 kV GIL设备技术支持、技术方案设计、技术参数选取及现场安装等主要内容,总结项目执行过程中的关键问题,剖析该项目的技术设计特点和安装技术,为今后类似水电站改造项目的技术设计和现场安装提供实践依据。
This article takes a hydropower station reconstruction project in Kyrgyzstan as an engineering example,studies the technical support,technical scheme design,technical parameter selection,and on-site installation of a hydropower station's 550 kV GIL equipment,and summarizes the key issues in the implementation process of the project.It analyzes the technical characteristics and implementation details of the project,and provides a practical basis for future technical design and field installation issues of similar power station reconstruction projects.
作者
张微
张晓伟
张烈
隗延哲
ZHANG Wei;ZHANG Xiao-wei;ZHANG Lie;KUI Yan-zhe(Beijing Power Equipment Group Co.,Ltd.,Beijing 102401,China)
出处
《电力勘测设计》
2020年第6期17-22,共6页
Electric Power Survey & Design
关键词
水电站
GIL
技术设计
现场安装
hydropower station
GIL
technical design
on-site installation