期刊文献+

装配式建筑在应急工程项目中的发展前景——以火神山、雷神山医院为例 被引量:14

The Development Prospect of Prefabricated Building in Emergency Engineering Project--Take the Case of Huoshenshan and Leishenshan Hospital
下载PDF
导出
摘要 确保工期是应急工程建设的重中之重,装配式建筑工业化的生产方式能够有效提升生产效率,逐步成为应急工程建设的重要方式.文中提出装配式建筑在临时性应急医院项目中的应用策略和优势,以确保应急工程按时完工. Ensuring the construction period is the top priority of emergency engineering construction.The industrialized production mode of assembly building can effectively improve the production efficiency and gradually become an important way of emergency engineering construction.This paper puts forward the application strategy and advantages of prefabricated building in the temporary emergency hospital project to ensure the completion of the emergency project on time.
作者 王春霞 杨贺贞 Wang Chunxia;Yang Hezhen(Shenyang Jianzhu University,Shenyang,Liaoning 110168)
机构地区 沈阳建筑大学
出处 《江西建材》 2020年第5期92-92,94,共2页 Jiangxi Building Materials
关键词 装配式建筑 应急工程 工期 发展前景 Prefabricated building Emergency engineering Duration Development prospect
  • 相关文献

参考文献3

二级参考文献12

共引文献56

同被引文献61

引证文献14

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部