期刊文献+

110kV变电站一次设备监测系统研究与设计 被引量:6

Research and Design of Primary Equipment Monitoring System for 110 kV Substation
下载PDF
导出
摘要 在煤矿高压供电设备进行检修、采矿设备需要跟进供电等情况下,一般采用移动变电站作为暂时供电设备,从而保障了煤矿的不间断供电。以煤矿智能移动变电站作为研究对象,分析移动变电站各部分的功能及特点,对移动变电站的监测系统进行研究,针对一次设备在线监测中存在的难点,设计相关硬件结构和软件平台,实现一次设备运行状态的实时监控。 In the case of maintenance of high-voltage power supply equipment in coal mines,mining equipment needs follow-up power supply,etc.,mobile substations are generally used as temporary power supply equipment to ensure uninterrupted power supply in coal mines.Taking the coal mine intelligent mobile substation as the research object,the functions and characteristics of each part of the mobile substation are analyzed,and the monitoring system of the mobile substation is studied.Aiming at the difficulties in the online monitoring of primary equipment,the relevant hardware structure and software platform are designed to realize the real-time monitoring of the running status of primary equipment.
作者 王健 WANG Jian(Electricity Company,Xishan Coal Electricity Group Co.,Ltd.,Taiyaun 030053,China)
出处 《机械工程与自动化》 2020年第3期218-219,222,共3页 Mechanical Engineering & Automation
关键词 硬件结构 软件平台 变电站 监测系统 一次设备 hardware structure software platform substation monitoring system primary equipment
  • 相关文献

参考文献5

二级参考文献8

共引文献49

同被引文献53

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部