千万吨级特大型选煤厂扩能改造实践

Practice of the work on renovation and capacity expansion of the 10 MPTY-class extralarge coal preparation plant
下载PDF
导出
摘要 为解决生产能力与矿井技术改造后生产能力不匹配的问题,陕煤集团红柳林矿业公司选煤厂在对矿井煤质进行充分分析的基础上,结合原有工艺系统的设计和设备选型方案,选煤厂进行了扩能改造,以提高该选煤厂的生产能力。 The treating capacity of the coal preparation plant under Hongliulin Mining Branch of Shaanmei Group fails to match up with the production capacity of the technically upgraded coal mine. To address this issue, work is made on renovation and capacity expansion of the plant based on thorough analysis of property of run-of-mine coal and by taking into consideration of the existing process design and the process equipment in current use.
作者 谭震 TAN Zhen(Shenmu Ningtiaota Mining Branch of Shaanxi Coal&Chemical(Group)Co.Ltd.,Yulin 719300,China)
出处 《选煤技术》 CAS 2020年第2期74-79,83,共7页 Coal Preparation Technology
关键词 千万吨级选煤厂 扩能改造 选煤工艺 浅槽重介分选机 10 MPTY-class coal preparation plant renovation and capacity expansion coal cleaning process shallow-bath heavy medium separator
  • 相关文献

参考文献13

二级参考文献73

共引文献118

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部