摘要
为解决生产能力与矿井技术改造后生产能力不匹配的问题,陕煤集团红柳林矿业公司选煤厂在对矿井煤质进行充分分析的基础上,结合原有工艺系统的设计和设备选型方案,选煤厂进行了扩能改造,以提高该选煤厂的生产能力。
The treating capacity of the coal preparation plant under Hongliulin Mining Branch of Shaanmei Group fails to match up with the production capacity of the technically upgraded coal mine. To address this issue, work is made on renovation and capacity expansion of the plant based on thorough analysis of property of run-of-mine coal and by taking into consideration of the existing process design and the process equipment in current use.
作者
谭震
TAN Zhen(Shenmu Ningtiaota Mining Branch of Shaanxi Coal&Chemical(Group)Co.Ltd.,Yulin 719300,China)
出处
《选煤技术》
CAS
2020年第2期74-79,83,共7页
Coal Preparation Technology
关键词
千万吨级选煤厂
扩能改造
选煤工艺
浅槽重介分选机
10 MPTY-class coal preparation plant
renovation and capacity expansion
coal cleaning process
shallow-bath heavy medium separator