期刊文献+

矿建工程中破碎围岩硐室围岩控制技术分析 被引量:1

Analysis of surrounding rock control technology in mining engineering
下载PDF
导出
摘要 随着我国煤矿资源的枯竭,为了保证煤炭资源的正常供应,越来越多的煤矿企业开始向着更深的煤层开采,煤层的深层开采工作中,大断面的破碎围岩的硐室变形情况比较严重,本次研究结合具体的工程现状,探索围岩支护的具体原则,并且研究出合理的支护方案。 along with our country’s coal resources dried up,in order to ensure the normal supply of coal resources,coal mining enterprises in growing Numbers are beginning to towards deeper coal seam mining,the deep mining of coal seam,the big cross section deformation of crushed surrounding rock of cavern situation is serious,the research present situation of combined with specific engineering,explore the specific principle of surrounding rock bolting,and study out the reasonable supporting scheme.
作者 王磊 Wang Lei(Shanxi Hongxia First Construction Co.,LTD,Yangquan 045000)
出处 《石化技术》 CAS 2020年第4期53-54,共2页 Petrochemical Industry Technology
关键词 煤矿开采 矿建工程 破碎 围岩 硐室 Coal mining Mining engineering Crushing surrounding rock Chamber
  • 相关文献

参考文献3

二级参考文献40

共引文献79

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部